• Navigation

    • Skip to Content
    This website uses cookies, our own and those of third parties, to provide the best possible experience. By continuing to use our website you consent to the use of these cookies. For more information, please Click Here
    Putzmeister
    SANY Logo
    • MERCHANDISING SHOP
    MY Putzmeister

    Join the conversation

    PGSRegions-web Portlet

    • INTERNATIONAL
    • EUROPE
    • AMERICAS
    • ASIA PACIFIC
    • AFRICA & MIDDLE EAST
    • RUSSIA & CIS
    • INDIAN SUBCONTINENT
    • English

    Navigation

    Toggle navigation
    • Updates
      image
      Updates

      Your window to the latest happenings at Putzmeister

      • Putzmeister in the News
        image
        Putzmeister in the News

        The latest news from Putzmeister

        • Asset Publisher

          On February 17th, 2020 Mr. Pius Neo joined Putzmeister as Regional Parts and Service Manager Asia Pacif...READ MORE

      • Press Releases
        image
        Press Release

        Heads up on what’s happening on Putzmeister

        • Asset Publisher

          On February 17th, 2020 Mr. Pius Neo joined Putzmeister as Regional Parts and Service Manager Asia Pacif...READ MORE

      • PM Post
        image
        PM Post

        Keeping you in the know

        • Asset Publisher

          Best Support Underground seeks to provide readers with useful, inspiring content about the wonderful wo...READ MORE

      • Events
        image
        Events

        Bringing Putzmeister to you

        • Asset Publisher

      • Archives
        image
        Archives

        The Putzmeister Encyclopedia

    • Success Stories
    • Products
      image
      Products

      Our extensive range of equipment

      • Concrete
        Concrete

        Solutions to all your concrete needs

        • CONCRETE PUMPS
          • TRUCK MOUNTED CONCRETE PUMPS
          • STATIONARY CONCRETE PUMPS
          • CRAWLER CONCRETE PUMPS
          • PRE-CAST EQUIPMENT
          • BORE PILE FILLING
        • PLACING SYSTEMS
        • BUFFER STORAGE
        • TECHNOLOGY
        • USED MACHINES
      • Shotcrete
        Shotcrete

        Power & accuracy to deliver results

        • MECHANISED
        • MANUAL
        • WET-MIX
        • TECHNOLOGY
        • USED MACHINES
      • Telebelt?
        Telebelt?

        Versatile equipment for quick results

        • PRODUCT RANGE
        • TECHNOLOGY
        • USED MACHINES
      • Mortar
        Mortar

        Reliable. Productive. User-friendly

        • COMPRESSED-AIR SCREED CONVEYORS
        • PUMPS FOR SELF-LEVELLING COMPOUND
        • SELF LEVELLING SCREED PUMPS
        • PLASTERING MACHINES
        • PUMPS FOR CONCRETE REPAIR
        • PUMPS FOR GEOTHERMAL DRILLING
        • PUMPS FOR FIRE PROTECTION
        • PUMPS FOR GLASS FIBRE REINFORCED CONCRETE
        • PUMPS FOR INJECTION/GROUTING/FILLING
        • PUMPS FOR MASONRY MORTAR
        • ETICS COMPOSITE BINDER
        • SAND,GRAVEL AND AGGREGATE
        • TECHNOLOGY
        • USED MACHINES
      • Tunnelling
        Tunnelling

        Safety. Quality. High Performance

      • Mining
        Mining

        Master the underground

      • Energy
        Energy

        Prioritising energy conservation

      • Environment
        Environment

        Reliable, eco-friendly systems

    • Support
      image
      Support

      Helping your operations run smoothly

      • Service
        image
        Service

        Helping your operations run smoothly

        • Warranty
        • Register Equipment
      • Training
        image
        Training

        Make the best use of your machines

    • Parts
    • About Us
      image
      About Us

      Get to know us better

      • Putzmeister at a glance
        image
        Putzmeister at a glance

        What Putzmeister’s all about!

      • Technology
        image
        Technology

        Putzmeister offers high-end Technology

      • Global Leadership & Our Team
        image
        GLOBAL LEADERSHIP & OUR TEAM

        Meet our skilled team

      • Our History
        image
        Our History

        Putzmeister : how it began to now

    • Contact Us
    • Careers
    • Webshop
    • Search
    • Search

      Search

      search

    Success Story Details - ASIA PACIFIC

    Asset Publisher

    • ZENIT ARENA, SAINT PETERSBURG, RUSSIA

      GOAL: WORLD CLASS, STATE-OF-THE-ART STADIUM FOR FIFA. FINE PRINT: NO PENALTIES ALLOWED

    THE GOAL WAS CLEAR: READYING FOR WORLD'S BIGGEST SPORTING EVENT- FIFA WORLD CUP 2018

    | Russia | Story
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn

    The idea was to build a world class stadium for the FIFA confederation cup in St. Petersburg - one that would dazzle the world for its state-of-the-art construction and facilities. With a capacity to hold 68,000 people, nothing but the best would do.

    PUTZMEISTER EQUIPMENT

    VIEW ALL PRODUCTS

    The Challenge :

     ? Large scale pumping and laying of concrete.

    ? Various Putzmeister machines were required for the construction of the stadium, ranging from simple to super-mixer truck cranes designed specifically for use at the facility, apart from concrete pumps, stationary concrete pumps, concrete pipeline and distribution boom etc.

       We were game for the challenge. 

     

    Various Putzmeister machines were required for the construction for the football stadium in St. Petersburg

    Various Putzmeister machines were required for the construction for the football stadium in St. Petersburg

     

    The Solution:

    Work on the supply of concrete mixtures was carried out by Concrete Pump Putzmeister BSF 47-5. 16H with a five-section boom, and folding the circuit RZ.

    Available options like the One Side Support and System Ergonic Pump allowed for work in cramped conditions more accurately and efficiently.

    "FollowMe" - an exceptional aid for the operator to operate without the use of distributive radio control at the operator end was a plus.

    Each modern Putzmeister concrete pump hydraulic system used a closed circuit FFH (direct flow hydraulics). This saved fuel, required less hydraulic oil and reduced its loss.

    The complete pump 16H develops an operating pressure up to 85 bar with a maximum capacity of up to 160 cubic meters per hour.

    For a more effective delivery of concrete mix,  one of the innovative features used was Ergonic? mounted on the concrete pump truck Putzmeister BSF 47-5.
    Ergonic? BoomControl? set automatically monitored the working area of the distributive - upper and lower limits, that is very important when applying concrete foundation slabs or volume ceiling.

     

    Concrete pump, equipped with Ergonic? Boom Control system has a large working area, which is necessary for supply of concrete in close proximity to the pump. Ergonic? Boom Control allowed the operator to skilfully manage the concrete truck even with relatively little experience.
     

    All modern equipped EOC systems (Ergonic? OutputControl) - automatically established the optimal engine speed according to the required capacity, optimized the fuel consumption and reduced the noise level.

    Using concrete trucks when installing high quality materials drastically reduced operating costs.

    In two years of operation Putzmeister concrete pumps transported over 70,000 cubic meters of concrete and only then took a partial replacement of the concrete on the distributive and some standard wear parts.

    The company StroyTehServis  was the partner as well as the official dealer of the company "Putzmeister-Rus".

    For a more effective delivery of concrete mix,?the Ergonic??mounted on the concrete pump truck?was used.

     

    For a more effective delivery of concrete mix, the Ergonic? mounted on the concrete pump truck was used.

    Concrete Takeaways :

    ? As it turned out, the monolithic concrete work completed, pumped and laid more than 430 thousand cubic meters of concrete, which in comparison was more than ten times that which was pumped during the construction of skyscrapers Empire State Building. It was also 110 thousand cubic meters more than was required when applying concrete to a height of 606 meters in the UAE in the construction of Burj Khalifa (~ 320 thousand. M3).

    ? The wide range of technology and complex services in rent, along with the service, warranty and post-warranty maintenance of the equipment helped us score.

    NEXT UP IN SUCEESS STORIES

    • Zenit Arena, Saint Petersburg, Russia
    • Yaroslavl, Russia
    • Yamal LNG, Yamal Peninsula, Russia

    VIEW ARCHIVES

    Next
    Putzmeister Logo

    Putzmeister South East Asia CT Pte Ltd.

    No. 7 Kranji Loop
    Singapore 739543

    Phone: +65-6293 20 29 
    Facsimile: +65-6293 11 58 
    E-mail: 
    contact.apac@putzmeister.com

    PARTNERNET

    CRM

    • PARTNERNET
    • CRM

    Products

    • Concrete
    • Shotcrete
    • Telebelt?
    • Mortar
    • Tunnelling
    • Mining
    • Energy
    • Environment

    UPDATES

    • Putzmeister in the news
    • Press Releases
    • PM Post
    • Events

    Success Stories

    • Jin Mao building, Shanghai
    • Qinghai-Tibet Railway, China

    Spare Parts


    SUPPORT

    • Service
    • Warranty
    • Training

    ABOUT US

    • Our History
    • Putzmeister at a glance
    • Global Leadership & Team
    • Technology

    CAREERS


    Used Machines


    CONTACT US


    Privacy Statement

    • PM SINGAPORE
    • PM JAPAN
    • PM KOREA

    Imprint


    MERCHANDISE

    Downloads


    Sitemap
    五香丁香在线观看